What is the method of soil replacement test?
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate the water content cement ratio
3 Answers Godway, Modern Construction Company,
Why we use pcc in foundation?
In 250x250mm cube, how much there will be cement,sand,water,and gravel
how to identify different types of soils in field?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
what is the allowable limit of wastage of cement for RMC at plant operated manualy
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Q:What is the formula of bar to bent the slab in bent slab? Second question Q: what is formula to calculate the hook?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
how many 1st class bricks in 1cu feet?
28 Answers ECCI, Jayant Group, L&T,
What is the amount on nails per bag needed for 1m square of wooden form work?
2 Answers Ansal Housing, College School Exams Tests,
How many required water of 1m3 Brick masonary and slab casting?
1 Answers Everest Bank, GVR, Vijay Nirman Company Pvt Ltd (VNC),
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)