Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I need to plaster an area of 1500 square meter. how much
quantity of cement and sand need for this.?

Answers were Sorted based on User's Feedback



I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this..

Answer / mohammed aijaz hussain

Let the thickness of plastering be 12 mm and CM(1:4)

Volume of wet mortar = 12 mm X 1500 sq.m.
= 18 cu.m.

Add 20% for depressions, joints and wastage
= 3.6 + 18 = 21.6 cu.m.

Volume of Dry Mortar = 1.3 X 21.6 = 28.08 cu.m.

Cement required = 1/5 X 28.08 = 5.62 cu.m.
= 160.6 Bags

Sand required = 4/5 X 28.08 = 22.46 cu.m

Is This Answer Correct ?    49 Yes 5 No

I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this..

Answer / ajith

For 1:6 plastering of 20mm thick cement needed is 150 bags or 7500kg n sand needed is 30cum.

Is This Answer Correct ?    15 Yes 10 No

I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this..

Answer / durgam

i need for 500sqm platering works ratio is 1:3 and how much required cement 

Is This Answer Correct ?    0 Yes 0 No

I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this..

Answer / sandip santra

actually 410bags cement required in 12mmthk plaster in 1:4
ratio.

Is This Answer Correct ?    1 Yes 7 No

I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this..

Answer / ahmed

Cement-1mt2 @10mmthnk-15.62Kg required Ratio 1:4
Sand=1mt2 @ 10mm thnk- 62.5 kg required
u need-468.6 bags of cement
U need-1875 Bags of Sand

Is This Answer Correct ?    4 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

How to convert N/MM2 TO KG/CM2

2 Answers  


What is different type of bills?

1 Answers  


what is the difference between mortar and concrete???

3 Answers   Indiabulls,


what are the types of trusses

1 Answers  


What are the reasons for geotechnical site investigations in uganda?

0 Answers  


In your experience what is the maximum beam length. What's beam size and also please provide column size also. Thanks.

1 Answers  


lap lenth

5 Answers  


how to calculate 1 cubic meter rcc concrete 1:1.5:3 ratio ,how much aggrates and sand , quanitites

3 Answers  


how much area can be platered by a mason for exterior

0 Answers  


significance of specific surface area of particles?

0 Answers   Gammon,


what is meant by civil engineer?

2 Answers  


dialation means

0 Answers   APGenco,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)