how much sand requires for Light weight blocks for 100sqft



how much sand requires for Light weight blocks for 100sqft..

Answer / civil engineer

8cft

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

0 Answers   Alembic,


why there is curve at the end in channel sectin

3 Answers   Birla, GNFC,


what is the load bearing capacity of the scafolding pipe (50mm) and other.

3 Answers   Gammon, IVRCL, L&T,


what are the layers of the national and heir aprox thickness??

0 Answers  


What do you understand by “preset” during the installation process of bridge bearings?

0 Answers  






which size of box use of cement,sand,aggregate to use the m 20 concrete. i know the quantity of material cement 400 kg or 8 beg ,662 kg sand and 1200 kg aggregate. i can use only 1 beg cement so pls give me answer . thx in advance

4 Answers   HCC,


How many kilo-newtons equals 1000 kilogram?

0 Answers  


For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor

1 Answers   RASA, Unity Infraprojects,


Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,

1 Answers  


rate analysis of shuttering

2 Answers  


which is cost effective Steel Structural or Concrete Structure building?

3 Answers  


If I want to lab 16 mm dia. bar with 20 mm dia bar with 40D lap length which dia.should I consider for lapping

12 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)