Define relative co-ordinates?
No Answer is Posted For this Question
Be the First to Post Answer
What does a construction cost covers and what does not?
Define What is the best type of wood glue?
What are the basic use of runners and standards of pipelines?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What are the advantages and disadvantages of lead products in construction?
how to find the cement and sand quantity for wall plastering
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
how to convert ft3 to m3?
Hi is it any equation or relationship that describe the stress-strain diagram in concrete deep beam?
How to decide/consider the grade of bitumen for dbm.
Any body please let me know how to prepare Method Statement for Bored Cast in situ piles.
4 Answers Colliers International,
how to prepare Steel schedule or Bar bending schedule.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)