Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why we do pcc.?

Answers were Sorted based on User's Feedback



why we do pcc.?..

Answer / kdg

Plain Cement Concrete (PCC) is nothing but a layer between
reinforcement and soil/mud to protect reinforcement as well
as RCC from direct contact of soil/mud beneath the
foundation.

Is This Answer Correct ?    16 Yes 1 No

why we do pcc.?..

Answer / guest

this is the leveling coarse.

Is This Answer Correct ?    14 Yes 3 No

why we do pcc.?..

Answer / yogesh yadav

plain cement
concret is a
base structre of
building,its save
to
renforcement
direct contact
to mud soil.

Is This Answer Correct ?    5 Yes 0 No

why we do pcc.?..

Answer / suresh s sonone

1.To make the surface uniform
2.To avoid the direct contact of R/F with ground.
3.To save the water absorbtion from concrete which is necessary for heat of hydration.

Is This Answer Correct ?    4 Yes 0 No

why we do pcc.?..

Answer / jainender

pcc doing far leveling he is protect mud and earth, dust ect

Is This Answer Correct ?    1 Yes 1 No

why we do pcc.?..

Answer / vignesh vicky

Not using for reinforcement

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate for ramp slop?

3 Answers  


what is chicken mesh?explain its use

5 Answers  


In case of tunnels (Railway) what is the way of securing a wall beam?

1 Answers   L&T,


What is allowable limit of silt in river sand for concrete

3 Answers   UIPL,


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


What is Lap Length??????

24 Answers   CCCL,


logical reasoning

0 Answers  


W mm mix rasio

1 Answers  


How to find the cuplock pipe qty in staging for Minor bridge?

0 Answers  


any book or article on pumped concrete.

0 Answers  


What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

0 Answers   Tirupati Exim,


Why use of fly ash in cement

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)