I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
No Answer is Posted For this Question
Be the First to Post Answer
how much % of cement can be replaced by flyash ....
whou haat goals do you have in your career
How much percentage of silt contain maximum allowed?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
what is the weight of one cubic meter M20 concrete ?
what is diffence in grade 43 & 53 of cement?
4 Answers KFC, L&T, NICE, Puravankara,
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is Rankine Cycle?
What"s mean by term of BOQ in construction?
13 Answers Jaypee, Shaarc Projects, Xerox,
what is the m25 test result 7 days 14 days
How to calculate the volume of sloped isolated footing?
What is Niminal mix and Design Mix ? write difference between them ?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)