what is the least count of staff ?

Answers were Sorted based on User's Feedback



what is the least count of staff ?..

Answer / nimmakayala

in fact it is depend up on the sort of leveling instrument
we use.
And
In general it is 5 MM

swamy

Is This Answer Correct ?    83 Yes 3 No

what is the least count of staff ?..

Answer / guest

5MM

Is This Answer Correct ?    61 Yes 3 No

what is the least count of staff ?..

Answer / renupandey

5mm

Is This Answer Correct ?    32 Yes 0 No

what is the least count of staff ?..

Answer / cooldeep

Least count of Staff is 5mm

Is This Answer Correct ?    19 Yes 0 No

what is the least count of staff ?..

Answer / civilsandeep

5 mm

Is This Answer Correct ?    16 Yes 0 No

what is the least count of staff ?..

Answer / kcr

5MM IS THE RIGHT ANSWER.

Is This Answer Correct ?    5 Yes 0 No

what is the least count of staff ?..

Answer / bala.divya

5mm

Is This Answer Correct ?    3 Yes 0 No

what is the least count of staff ?..

Answer / elangovan

0.005M

Is This Answer Correct ?    5 Yes 2 No

what is the least count of staff ?..

Answer / premkumar

it is + or - 5mm

Is This Answer Correct ?    2 Yes 14 No

what is the least count of staff ?..

Answer / nagaraj

levelling instrument is up down and small mistakes in level pocus in 1mmto 5mm

Is This Answer Correct ?    1 Yes 18 No

Post New Answer

More Civil Engineering Interview Questions

what is the praposion of M30 concrete mix.

6 Answers  


what is meant by point of contraflexure?

3 Answers  


explain five benefits of using standard terminology in the measurement process?

0 Answers  


Are you a team player?

0 Answers  


What do you mean by Hydraulic Piling??

2 Answers  






Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..

0 Answers  


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

0 Answers   bsmcpl, L&T,


what is column foundation

0 Answers  


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

0 Answers   Government, L&T,


in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.

0 Answers   Apex,


CALCULATE QUANTITY OF RCC COLUMN

2 Answers   L&T, NBCC,


How Calculate Lap Length

10 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)