Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what"s the responsibilities for QC(quality controler)in high
rise buildings?

Answers were Sorted based on User's Feedback



what"s the responsibilities for QC(quality controler)in high rise buildings?..

Answer / n c pathan

The answer can not be given in one line. QC Engineer has
lot of responsibilities. It involves mainly quality of
materials and quality of workmanship. He has to see that
work is being executed in accordance with the
specifications laid down in the contract. In order to
achieve over all quality he has to maintain record of cube
testing of concrete, test results of steel and other
construction material at site.

Is This Answer Correct ?    29 Yes 0 No

what"s the responsibilities for QC(quality controler)in high rise buildings?..

Answer / deepak

To Check the Quality work at each stage as per IS Code or the Vendor Methodology

Is This Answer Correct ?    10 Yes 2 No

what"s the responsibilities for QC(quality controler)in high rise buildings?..

Answer / raghavendra

The QC engineer ensures the work is carried out according
to the project contract specifications,project quality plan
(PQP),inspection and test plan(ITP)....He is also
responsible for timely reporting of any non-comformance,un-
approved material usage etc. etc.

Is This Answer Correct ?    3 Yes 0 No

what"s the responsibilities for QC(quality controler)in high rise buildings?..

Answer / ksrao

Inspection of works three 3 stages
Pre construction : input materials testing
During construction : cocrete- w/c ratio cubes casting ,Brick work - proportion of cm,joints etc
Post construction:finishings, levels,testing of strengths with CTM,core cutter,NDT tests

Is This Answer Correct ?    0 Yes 0 No

what"s the responsibilities for QC(quality controler)in high rise buildings?..

Answer / ksrao

Monitoring all the works stage wise maintaining
ITP,QAP,QMP and maintaining all records related to QC.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How you calculate cement,sand,20mmbluemetal,40mmbluemetal,bricks for various works

1 Answers  


in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

0 Answers  


URGENT: please tell me what's normal drawing scale for residential building and commercial building? Thanks.

5 Answers  


can any one tell me how to estimate the reforcement of circular slab and also for dome.

1 Answers  


What is the shelf life of a refractory used in boiler furnace ?

4 Answers   Monster,


std heights of c.p fitting from ffl like health faucet,wall mixer,shower arm,european commod,wall hanging commod etc.

1 Answers   Maples,


Trapezoidal section footing calculation of Volume & its Area

8 Answers   MCC, Real Value,


where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.

0 Answers  


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

0 Answers  


For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the weight of sand and aggregate

4 Answers   Lanco, Reliance,


Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..

0 Answers  


what is the life span of water proffing plywood for concreteshuttering work

3 Answers   Fusion, IVRCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)