Answer Posted / s.k.roy
Based on experience the Consuption for a Building of 10-15
Storey :
Beams 125-140 Kg per cu.m of Concrete
Slabs 80-100 Kg per cu.m of Concrete
Columns 350-400 kg per cu.m of concrete
Footings100-125 Kg per cu.m
In general for a Eartquake Resistant Str in Zone 3/4 the
steel consumption can vary between 6.5 to 7.5 Kg per
sq.feet of Constructed area
| Is This Answer Correct ? | 29 Yes | 7 No |
Post New Answer View All Answers
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
Explain what is change order request?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
Material calculation of cm 1:6 for 1sqm
what is floating slab foundation?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
how much shouid be the rate for ready mix concrete per cubic meter
Explain how you can turn off the display for dimension in CAD?
questions with answers to face an interview of an civil engineer regarding RCC buidings
I want to join bhel because
What are the advantages of cad software?
For Wet Mix Mecadam design what is Optimum moisture content
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
List out some of the software used in the construction sector to estimate cost and monitoring expenses?