what r you reqired for concrete baching plant?
No Answer is Posted For this Question
Be the First to Post Answer
If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not
2 Answers Al Fara, Unity Infraprojects,
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
design mix for M15,M20, M25,M30 please
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
what is mixed design, define it? what is way beecher?
how to prepare the bar bending schedule for a given rcc material?It will be more helpful if you explain me with an example?
what is mean by short coloumn? it is depend on the height? or dia of coloumn.?
1:6 mortar, how many self life hours ?
Sir how to find cutting length for footing steel bars in the shape of "u"
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
plz tell me max persantage of sand for every mix design by volume or weight.
What do you mean by TOLERANCE in steel