What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60
cement content,aggrigate,sand and water ratio.
No Answer is Posted For this Question
Be the First to Post Answer
what is the difference between stress and pressure??
how to calculate the bricks in 100yard
please send the model qn paper of jindal steel power in civil engineering..
in railway engineering, what are the types of guages? what is its size,length & thickness?
What isthe formula for square
1 Answers Panchayati Raj Department,
how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
M.C.Q
3 Answers Mitsui OSK Lines, TechInfini,
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Explain moment of inertia and its importance.
Ratio of cement : sand for fixing slab and tiles in the floor and also quantity of cement and sand requires for laying slab and tiles separately (area 100 sq. ft)
which is the period is known as golden period in ancient india?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)