Answer / pravin sonawane
gypsum has more strength and quality compare to POP, both are used in wall panelling , punning, false ceilings, other interior decorative work.
| Is This Answer Correct ? | 51 Yes | 11 No |
Answer / karan sardana
gypsum boards are used for false ceiling purposes bcoz of their inertness towards water in case of leakage, while pop is used over plaster to cover the irregularities in plaster....it also smoothens the plastered surface...
| Is This Answer Correct ? | 24 Yes | 16 No |
Answer / santosh bhoge
Gypsum and POP are same with respect to material composition.If you are heating gypsum at around 150 temp it will dehydrate and covert to POP.
| Is This Answer Correct ? | 15 Yes | 13 No |
Answer / nag
Gypsum is using celling work pop is gypsum to covering use gypsum shets only pop is poweder
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / s.alagusundaram
gypsum using of wall partion & falls celling work innerusing,
Before applying for POP.
POP is using of wall partion above applyying for smooth surface purpose.
| Is This Answer Correct ? | 5 Yes | 13 No |
gypsum is used in wall board in mostly iteroier walls but
pop panal use in exterier surfaces of building with
aluminium. its a building part........
| Is This Answer Correct ? | 6 Yes | 35 No |
Answer / shruthi
gypsum is used in wall board,pop is not building material
| Is This Answer Correct ? | 12 Yes | 58 No |
CAN WE ADD SOME EXTRA QUANTITY OF GYPSUM INTO CONCRETE? WHAT PERCENTAGE WE CAN ADD? WHAT IS THE EFFECT ON STRENGTH?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
what is the effect of duration of earth quake on framed structures ?
what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?
3 Answers Ashok Leyland, Marathon Realty,
how many average of shuttering in one cubic meter concrete
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
for brickmasonry strengthwise which bond is better?
What is grouting? Why it is done?
what is the I.S. CODE of RCC
is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?
Any body tell me how can we calculate 1m3 quantity of cement sand aggregrate in kg.
WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC
7 Answers Omaxe, Shoba Devlopers,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)