what is diffrence between catchment area,watershed and basin?
No Answer is Posted For this Question
Be the First to Post Answer
The Instrument used to determine colour of water is called A] Turbidimeter B] osmoscope C] Barometer
pls explain me the design procedure of multistorey building including structural analysis and also with example by considering the effect of wind load and earthquake load ?
What is the allowable silt content for concrete works?
Water cement mixing in hopper less mixture machine is better than hopper mixture machine because:
Calculation of Pier Cap with tapper area?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
The point of contraflexure occurs in
what is smart building materials?
what does 1 in 30 or 1 in 40 mean when constructing camber in roads.
Grades of concrete
28 Answers Mittal Steel, UNOPS,
What was asked in isro civil interview
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)