a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
Is This Answer Correct ? | 3 Yes | 7 No |
How do you determine or evaluate success?
For the construction project what capital cost has to be taken in consideration?
sir tell me what are the rules to find out the cut length? and what is the deduction in dia to be made ?
Describe the term BILL OF QUANTITY (BOQ)?
What is the proportioning by weight of 1:2:3 concrete mix design of cement, sand, gravel, and water in metric for a 3000 PSI concrete strength and a target slump of 75-100mm?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What salary do you expect? to a 10 yrs experienced civil engineer?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
What is the difference between single reinforcement
How you can use different dimension tools in cad? What are the different dimensions available?
How many cement mortor dry quantity required for 1m3 ?(1:4)