Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.



a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b..

Answer / bharath m

Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.

Bharath M
Tamil Nadu
8438238335/9980644165

Is This Answer Correct ?    3 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?

2 Answers   GMC,


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

0 Answers  


how to calculate sand in CFT from a concrete foundation (m^3)???

1 Answers  


define silt?

4 Answers   DLF,


what is the use of water bar in water tank and is this an extra item in estimate?

0 Answers   PS Constructions,


10mm Rebar total 12meters length how to calculate ?

4 Answers  


Wat are the elements consider in the shuttering load design calculation

1 Answers  


what is difference between 33, 43 and 53 grade cement..? which is more suitable for construction and why,..??

3 Answers  


How you calculate cement,sand,20mmbluemetal,40mmbluemetal,bricks for various works

1 Answers  


It needs contour survey before plastering a wall / column & floor tiles setting to get––

1 Answers  


What is meant by Rolling Margin? & which material will effect in this ?

2 Answers   Construction, L&T,


What is packing Factor ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)