a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
| Is This Answer Correct ? | 3 Yes | 7 No |
How much Pressure will apply in Water proofing Grouting method to fill the crack in beams or slabs?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
how to calculate sand in CFT from a concrete foundation (m^3)???
define silt?
what is the use of water bar in water tank and is this an extra item in estimate?
10mm Rebar total 12meters length how to calculate ?
Wat are the elements consider in the shuttering load design calculation
what is difference between 33, 43 and 53 grade cement..? which is more suitable for construction and why,..??
How you calculate cement,sand,20mmbluemetal,40mmbluemetal,bricks for various works
It needs contour survey before plastering a wall / column & floor tiles setting to get––
What is meant by Rolling Margin? & which material will effect in this ?
What is packing Factor ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)