How to Determine the Quantity of Cement Sand , Aggregete
and Reinforcement Bars in 30 feet X 40 Feet and Height is 4
Feet .
Answer / prabu
1 feet = 0.3048 meter
30'*40'*4' = 9.144 *12.192 * 1.2192 meter
total volume = 135.92 meter cubic
1 bag cement = 50 kgs
unit wt of cement = 1440 kg/m3
density = weight/volume = 50/1440 = 0.0347m3
if concrete grade is M20 and ratio is 1:1:2
1+1+2 = 4
cement = 135.92/4 = 33.98
33.98/0.0347 = 979.25 bags
1 cement bag = 50 kgs, so
979.25 bag = 979.25 * 50 = 48962.53 kgs
sand = 1* 33.98 = 33.98 m3
aggregate = 2*33.98 = 67.96 m3
for slab = 0.7 -1% of concrete volume (reinforcement provided )
for beam = 1 - 3%
for column = 1 - 5 %
for footing = 0.8 - 8%
in this problem = 135.92 m3 concrete
for slab = 135.92 * 0.007 = 0.95m3 volume reinforcement provided.
ans =
cement = 48962.53 kgs or 979.25 bags
sand = 33.98 m3
aggregate = 67.96 m3
for slab = 0.95m3 volume reinforcement provide
Is This Answer Correct ? | 9 Yes | 5 No |
what is the ratio of m50 grade in concrete block
how to calculate freeboard in under ground water tank and technical details
Define what is quality...
what is the formula of calculating number of bars?
How to calculate Volume of Wet cement concrete for a specific grade?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
How much sand for a 107sqm residensial building
1 Answers Shapoorji Pallonji Group(SPCL),
what is parametre for M25 after 7 days strength
what is the quantity of cement sand and metal in a 1m^3 m15 standard concrete
how much binding wire is reqd for 1 MT
acceptance criteria for concrete works
how to calculate the number of bricks for 10'x10' wall?