a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer Posted / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
How is improve my knowledge in construction industries....
how many type of admixtures for water stored structure?
what are the five benefits of using standard terminology in the measurement process?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
What is the effect of a building collapse?
In which code the the maximum height of concrete casting has been explained
How much cement is require in one sqft area in a G+3 residential construction.
How to calculate Volume of Wet cement concrete for a specific grade?
how many tonnes equals to one cubic feet?
60-70 grade of Bitumen is VG-30 ?
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
Describe the advantages and disadvantages of using plastic and timber fenders?
Define What is the difference between routing maintenance and major maintenance in school facilities?
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance