a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.
Answer Posted / bharath m
Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.
Bharath M
Tamil Nadu
8438238335/9980644165
Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
pile load testing procedure
Explain what is Critical Path Method (C.P.M)?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
what would be the design load of R.C.C Cooling tower per cell.?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What are the applications of cad?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
What is the biggest dam in america?
about higyway engineering
how much required strength of cement concrete bricks(size 230x115x75mm)
What is thumb rule in quality and quantity estimation of a Residential building??
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
how i can tak Quantity of mortar in block work