a) we have 30nos., 300mm dia, 4m length double under
reamed piles.calculate excavation quantity.b) tell
concrete qty. also.

Answer Posted / bharath m

Hai,
Please find the answers below.
a)Excavation quantity
Straight pile = 3.14/4*.3*.3*4*30 = 8.49 Cum. +
Under reamed portion (2 Nos. per pile) = 2*3.14*.318*(.2)*.225*2*30 = 5.39 Cum. Total = 8.49+5.39 = 13.88 Cum.
b)Concrete quantity
as same as item (a) above.

Bharath M
Tamil Nadu
8438238335/9980644165

Is This Answer Correct ?    3 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

pile load testing procedure

1755


Explain what is Critical Path Method (C.P.M)?

685


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1822


what would be the design load of R.C.C Cooling tower per cell.?

1570


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2193






What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1567


In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.

3721


What are the applications of cad?

678


WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?

1606


What is the biggest dam in america?

671


about higyway engineering

3570


how much required strength of cement concrete bricks(size 230x115x75mm)

1583


What is thumb rule in quality and quantity estimation of a Residential building??

1218


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1922


how i can tak Quantity of mortar in block work

1988