Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to calculate the sand and aggregate in concrete



How to calculate the sand and aggregate in concrete..

Answer / ajay saini

this is incomplete question .First of all you ought to know about the grate of concrete and the mix proportion of concrete.if this is M-10 then 1:3:6 ration will be followed here 1 is for cement 3 is for sand and 6 is for aggregate.

Is This Answer Correct ?    10 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

Define What is passive earth pressure ?

0 Answers  


# 1. Water observation capacity (MAximum)of Solid bricks # 2. Minimum Crushing Strength of Solid Blocks.

4 Answers   Brigade,


How could I calculate quantities of fine aggrigates(sand) & coarse aggregates in pcc M15

1 Answers   Coromandel, RECPDCL,


what is scaffolding and state is purpose

8 Answers  


How much is the curing time period?

1 Answers  


1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.

0 Answers  


how to calculate the concrete mix m30 by volume

0 Answers  


how many nos of hacking over concrete surface required for 1 sq m area

12 Answers   Creative Turnkey Projects, L&T,


a)tell density of steel , concrete, bricks , sand and aggregates.? b) what is knife test for wooden doors ? c) what is the meaning of term abrasion? what is tested in it? d) why pile foundation is provided in BCS?e) By total station what activities can be performed and on what principle it works? f) what is creep?

4 Answers  


How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?

0 Answers  


what is the IS code no. for concrete wastage?

1 Answers  


what is period of de-shuttering for different area of slab of M25 grade?

2 Answers   ATS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)