please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Answer / dilip wasudeo jadhao
Site Engineer-supervising to the worker working on site and
guide them for proper execution.
Quantity surveyor- Estimate the quantity of the work under
execution.
Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.
Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.
Is This Answer Correct ? | 2 Yes | 0 No |
How to calculate 1 brss for RCC work
0 Answers Allied Group, Jyoti Structures Ltd,
Concrete could be defined as, (1)An artificial stone (2)Structural stone (3)Strong stone (4)Rock and Sand stone
Is density and unit weight are same, if not why both r having same unit, wats the difference between them.
what is the difference between arch dam and gravity dam. Name a gravity dam in India
6 Answers AAI Airports Authority Of India, L&T,
10 sqr in room reinforce concret so athu evvalavu wait thankum , atha eppati calculate panrathu
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
what is difference in chemical composition between fe415 and fe500
what is the density of Coarse Aggregate in 1 cu m of Concrete?
Are you good at detailing and explain about the project you have worked on detailing?
beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.
what is the bar bending schdule