please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer



please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality co..

Answer / dilip wasudeo jadhao

Site Engineer-supervising to the worker working on site and
guide them for proper execution.

Quantity surveyor- Estimate the quantity of the work under
execution.

Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.

Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How to calculate 1 brss for RCC work  

0 Answers   Allied Group, Jyoti Structures Ltd,


Concrete could be defined as, (1)An artificial stone (2)Structural stone (3)Strong stone (4)Rock and Sand stone

1 Answers  


Is density and unit weight are same, if not why both r having same unit, wats the difference between them.

3 Answers  


what is the difference between arch dam and gravity dam. Name a gravity dam in India

6 Answers   AAI Airports Authority Of India, L&T,


10 sqr in room reinforce concret so athu evvalavu wait thankum , atha eppati calculate panrathu

0 Answers  






Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

0 Answers   Baseraa,


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

0 Answers  


what is difference in chemical composition between fe415 and fe500

1 Answers  


what is the density of Coarse Aggregate in 1 cu m of Concrete?

7 Answers  


Are you good at detailing and explain about the project you have worked on detailing?

1 Answers  


beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.

3 Answers  


what is the bar bending schdule

7 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)