please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Answer / dilip wasudeo jadhao
Site Engineer-supervising to the worker working on site and
guide them for proper execution.
Quantity surveyor- Estimate the quantity of the work under
execution.
Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.
Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.
Is This Answer Correct ? | 2 Yes | 0 No |
What is diversion tunnel in a dam?
What is called dummy column, & what its uses ?
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
how many litr. of paint will required for 1 sqm area of wall(internal wall and external wall) ??
cavitations is caused by
how much cement and sand is used for plastering 1646 sq feet,for 12mm thickness and ratio 1:4
what is a coupler and where do u use it ?
what is stress?
What is the minimum compressive strength of a brick according to IS codes ?
30 Answers Arup, CCCL, GMR, L&T, Rachana Sansad, Theme Engineering, WAPDA Water and Power Development Authority,
How to design a beam without any typical(tuff) calculation. Answer Only by using site practical knowledge?
what is the significance of bending moment in a structure?
in steel bar weight formula (d^2/162).so what is 162.