what is the compresive strength of m20 concrete at 7 day
Answers were Sorted based on User's Feedback
Answer / ak mishra
as m20 is specification .as we know compressive strength of
M20 after curing will be 20kn/m2.but after 7 days it will
gain 60% strength..........
| Is This Answer Correct ? | 60 Yes | 21 No |
Answer / munish neb
for 7 days: 60 -70%,for 14 days : 80 - 90% , for 28 days : 100 %
for all types of grade
| Is This Answer Correct ? | 19 Yes | 2 No |
Answer / nakkeeran.raja
IT SH'D have 2/3 of its strength after 7 days
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / ginikanwa nuga adiele
the concrete must have attained 2/3 of the streght = 13.5-14kn/m2
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / ranjan
M20 7 days strength
Ft = t
-------- x f28 f28 is strength of 28 days
a+bt
a & b are imperial constants
a = 4.70
b= 0.833
given formula f 7 = 7
------------ x 20
4.7+.833 x 7
=0.665 x 20
=13.3
| Is This Answer Correct ? | 9 Yes | 3 No |
Answer / suresh
COMPRESSIVE STRENGTH OF M20 CONCRETE AT 7TH DAY IT SHOULD BE
MORE THAN 80 PERCNTAGE= MORE THAN 160KG/SQCM
| Is This Answer Correct ? | 1 Yes | 1 No |
how many m3, mason should done per day if he going to build 4.5 inch brick work(partition wall)?
What are the Noms/8hr for Concrete Work for Mason,Carpenter,Steel Fixer
If i buy some material and the seller asks me my TIN number what does that mean?? Is it my Taxpayers Identification number or it is my Tax invoice number? What does both of these stands for???
In case of columns the cover is from main steel or from stirrup & which is the IS code mentioned in it?
what"s the difference between fe 415 grade steel and fe 500 grade steel? and which one is mostly used for residential and apartment constructions?
if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
How to calculate material requirement for 230mm thick, 1 sq.m brick masonry?
Beam test is carried out for?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)