please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Answer Posted / dilip wasudeo jadhao
Site Engineer-supervising to the worker working on site and
guide them for proper execution.
Quantity surveyor- Estimate the quantity of the work under
execution.
Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.
Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In jack arch floor, the rise is kept?
RR masonry rate analysis
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
residential projects,structural.
Explain why concrete barriers have curved surface profiles?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
115mm thickness brick work how to required mortar
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
How to find beam R/F cutting length
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
how to find ssm in foundation?
how i convert mm into standard wire guage (SWG)no.
plumbing CPVC fitting FTE Brass full form
3. What are the disadvantages of your present job, things you do not like about it?