please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
Answer Posted / dilip wasudeo jadhao
Site Engineer-supervising to the worker working on site and
guide them for proper execution.
Quantity surveyor- Estimate the quantity of the work under
execution.
Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.
Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How is the strength of cement measured?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
List out some of the common problems that architect have to tackle it?
how to calculate load bearing column
what is concrete canvas?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What is the difference between built area and super built up area?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Bernaullis theorem deals with the law of conservation of mass momentum energy none
What is the snap size in civil and how can we create it?
how to calculate total cost for slab 35'×8'
What is meant by dimensioning?
How much cement and water required for cement selery????
For what purpose bedding is used under storm water drains, explain?
how to calculate the size of triangular ring in rcc column?