Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer

Answer Posted / dilip wasudeo jadhao

Site Engineer-supervising to the worker working on site and
guide them for proper execution.

Quantity surveyor- Estimate the quantity of the work under
execution.

Quality control engineer- To carry out different test of
material used for the construction and by which control the
quality of work.

Planning engineer- To plan the different activities
according to time limit and execute the work in schedule and
also see whether execution on site going properly within
time limit, accordingly appoint the worker and give material
requirement.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In jack arch floor, the rise is kept?

1156


RR masonry rate analysis

3344


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

1096


residential projects,structural.

2876


Explain why concrete barriers have curved surface profiles?

1241


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

2337


115mm thickness brick work how to required mortar

2060


What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?

1136


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1921


How to find beam R/F cutting length

1788


I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?

2562


how to find ssm in foundation?

1930


how i convert mm into standard wire guage (SWG)no.

3052


plumbing CPVC fitting FTE Brass full form

2688


3. What are the disadvantages of your present job, things you do not like about it?

2796