what is high type road and low type roads
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate steel for beam slab and column
why steel stirrups in column have more spacing at center and less spacing at both ends??
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
What is the factor of safety in civil engineering
What is critical path method (c.p.m)?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
how to check aggregate quantity in stock yard
how can we find out the ratio of cement and sand in plastering
What is thumb rule in quantity and cost estimation of a residential building?
0 Answers Ascent Constructions,
what is labour consume factor in residential projects
shape of aggregates used in concrete should be rounded/cubical or elongated/flaky.
9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)