what is quantity of sand required to plaster wall about
1000 sq ft
Answer / v ramesh
area in m^2 = (1000/10.76)=92.95sqm..
volume=92.95X(12/1000) = 1.12M^3
add 30 t0 35% of bulking of sand= 0.336M^3
add 20% for wastage of sand = 0.224M^3
total = 1.68M^3
=(1.68/(1+4)) = 0.336m^3
=cement = 0.336*30=11 bags
= sand = 0.036*4 = 1.344M^3 of sand
| Is This Answer Correct ? | 1 Yes | 0 No |
How to calculate steel quantity in beam and column?
what type offoundation suitable for clayey type soil
Brick size 230X115X150mm, how many bricks, quantity of sand, cement required to construct 10 sq mtrs of 115mm thick brick wall.
clear cover means the distance between main bar outer face to shuttering face. Is it right?
How we paste the Granite Slabs at External Wall?Is there any chemical compound material was using?
What is density of crush sand and fine aggregate
What is the crank length in the slab?
significance of specific surface area of particles?
Give me an example of a time when something you tried to accomplish and failed.
Which are the Steel tests ?
How many steel is require in one sqft area?
17 Answers L&T, XYZ,
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)