I have an plot with area 35*47 = 182.77 sq yards.
Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
No Answer is Posted For this Question
Be the First to Post Answer
Are you having any structural design experience?
4 Answers Ajnara Group, Jeyam Homes, L&T,
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?
deshuttering time for RCC wall & column
How long does it take concrete to harden?
For a washout valve why are two gate valves required in normal practice?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
what is the diffreance between 1 way slab& 2way slab?
how to replace 8mm bar with 10mm bar if the the 8mm bar is not available..???
why development length = 50D . why not 100D
Rate analysis of painting