Answer Posted / mahij
TMT..BAR..
means a thermo mechanical process done on a steel bar..
| Is This Answer Correct ? | 31 Yes | 10 No |
Post New Answer View All Answers
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
What are the common ways of demolition?
What are some structures that may be subjected to fatigue?
How much is the cover for slab?
What quantity of 1.0 m3 bricks required?
What will be weight of 0.5mm GI sheet per sq.ft?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
what is constat for brickwork
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What is meant by cartesian coordinate system?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.