i m passed my engineering in 2010 in instrumentation and
control engineering. my question is can i apply for software
jobs or vacancies.??????????? plz give me answer soonnn......

Answers were Sorted based on User's Feedback



i m passed my engineering in 2010 in instrumentation and control engineering. my question is can i..

Answer / priya

s you can get the software jobs but its not suitable for
instrumentation field.. better you are trying
instrumentation related jobs

Is This Answer Correct ?    4 Yes 0 No

i m passed my engineering in 2010 in instrumentation and control engineering. my question is can i..

Answer / darsh

yes you can do if u hav knowledge thoroughly abt c or c++ or
dot net...do any one course and try to oncentrate on any one
surely u vl rock....coz ma frnd who studied ECE and placed
in patni software since she did dot net course...so you
havin chance to do and get

Is This Answer Correct ?    4 Yes 1 No

Post New Answer

More Instrumentation Interview Questions

What is difference between radial vibration and axial vibration explain in detail .

0 Answers   Emerson,


is any standard angle for thermowell mounting for horizontal and vertical pipe lines?

3 Answers  


How does a redundant controller comes in line when the main controller fails??

3 Answers   Yokogawa,


List three types Level Switches with their working principles

0 Answers  


What is the procedure of calibration of Load cell?

0 Answers  






What is the reason for not giving very High Proportional Gain Kp in PID Controller?

2 Answers   ABB,


Will Intergraph support SmartPlant Instrumentation in an AutoCAD or MicroStation environment on a long-term basis?

1 Answers   Siemens,


in which application we use bigger size actuator

5 Answers  


Why 4-20mA SIGNAL IS PREFERRED OVEA A 0-10v signal?

5 Answers  


Name different parts of a pressure gauge.

0 Answers  


In my company plc based winders are operated. one day there was a data transmission failure alarm shown on pc. as per sir instruction we have reset master plc but winders were not triped and alarm gone. so what master plc do?

0 Answers  


what is the differnce betweeen hart and smart tx

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)