I have a single cycle maintenance plan that is triggered by
a counter assigned to a equipment A. If I replace equipment
A with equipment B how do I change my Maintenance plan
counter? When I use IP02 "change maintenance Plan" the
counter box is greyed out. Thanks for any advice.

Answer Posted / mahendra

Create a new counter and plan for equipment b

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What steps must be defined in customizing for alternative labelling?

526


What is the criteria to change the equipment category?

461


What is concept of equipment numbering?

773


what do you mean by reverse counter?

538


what do you mean by measuring point?

498






Which task lists are object based?

483


Which equipment category is used to represent laboratory equipment?

454


What is the integration between pm and qm in sap?

562


Is it possible to install an equipment to a functional location without data transfer from function location to equipment?

523


What action will you take if inspection lot is not generated from calibration order? Which setting will you check?

595


How can we block service to a customer ? It has to be done through the fl, since most of the equipment belongs to the company and is loaned to the customer ?

467


If I want to trigger a maintenance order from a maintenance plan on every 7th day of a month, then what settings will I do in the maintenance plan other than a maintenance cycle of 1 month.

497


Differentiate between control keys pm02 and pm03.

384


How maintenance strategy plan is different from multiple counter plan.

498


How pm module is integrated with ehs module?

668