I have a single cycle maintenance plan that is triggered by
a counter assigned to a equipment A. If I replace equipment
A with equipment B how do I change my Maintenance plan
counter? When I use IP02 "change maintenance Plan" the
counter box is greyed out. Thanks for any advice.
Answer Posted / mahendra
Create a new counter and plan for equipment b
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are activities of a sap pm?
What is concept of equipment numbering?
How can a user differentiate simply between an equipment which has been charged and not charged for a service?
Which t code is used to do usage decision on inspection lot triggered by calibration order?
What level of functional locations should be changed for alternative labeling?
What is refurbishment process?
Can we assign one maintenance item to more than one maintenance plan?
What is the integration between pm and qm in sap?
You want to control the sap pm order type. How would you do that?
How do you define an own view for alternative label?
Hi, How to reverse the refurbishment order process incase the user 1)dont want to get the goods back and 2)without incurring the cost?
explain teco?
What are the activities of a sap pm?
For an equipment master record what fields need to be filled in?
When do you perform breakdown maintenance?