Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why we use casced loop

Answers were Sorted based on User's Feedback



why we use casced loop..

Answer / ch amir islam

We use CASECAD loop to inhance the capability of the
process.normally we use this loop at BFW(boiler feed water)
tanks and at the BMS(burner managment system)to inhance the
burning ratio of fuel that become more relaiable for our
firing.because we are using here two controller(two
setpoints)these both controller makes process much more
flexible and accurate.

Is This Answer Correct ?    4 Yes 1 No

why we use casced loop..

Answer / ch amir islam

We use CASECAD loop to inhance the capability of the
process.normally we use this loop at BFW(boiler feed water)
tanks and at the BMS(burner managment system)to inhance the
burning ratio of fuel that become more relaiable for our
firing.because we are using here two controller(two
setpoints)these both controller makes process much more
flexible and accurate.

Is This Answer Correct ?    1 Yes 1 No

why we use casced loop..

Answer / www.islamqa.com

Using cascade control enhance loop stability, as the
controller generatea corrective signal in case of any change
in process load - we don't need to wait till we got a
problem in the measured process variable (pressure,
temperature, ..)

Regards,

Ahmed Sabry
Control and Instrumentation Engineer
GPC - General Petroleum Company
CELL.: 00 2 0121367310
ahmedsabry.online@gmail.com

Is This Answer Correct ?    0 Yes 0 No

why we use casced loop..

Answer / sreekanth

If a PID Setpoint is derived from another PID then the loop
is called cascade loop.

Is This Answer Correct ?    1 Yes 1 No

why we use casced loop..

Answer / vijay patel

cascade loop is used for the control of one perameter buy measure another perameter which is help to enhanse the stability of the loop.

Is This Answer Correct ?    0 Yes 0 No

why we use casced loop..

Answer / www.islamqa.com

Using cascade control enhance loop stability, as the
controller generatea corrective signal in case of any change
in process load - we don't need to wait till we got a
problem in the measured process variable (pressure,
temperature, ..)

Regards,

Ahmed Sabry
Control and Instrumentation Engineer
GPC - General Petroleum Company
CELL.: 00 2 0121367310
ahmedsabry.online@gmail.com

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Instrumentation Interview Questions

What is difference between differential pressure & delta pressure?

0 Answers  


What is the formula to convert mv to temperature in k type thermocouple?pls simply elaborate? I got one ans.it is Temp=mv×25°+atmospheric temp,but here what is 25°,i confusef ,so pls????

2 Answers   HPCL,


send me model hpcl questions pleas..........my mail id mohideen.dharvesh@gmail.com

0 Answers   HPCL,


how does we do bench calibration of a differential transmitter.

1 Answers  


Can SmartPlant Instrumentation be used in a concurrent engineering environment?

1 Answers  


What is wet leg condition and why is it used?

0 Answers  


How do you identify an orifice in the pipeline?

0 Answers  


can u plz send me technical questions asked in SCHNEIDER ELECTRICAL technical paper?

0 Answers   TCS,


WHAT IS THIS INSTRUMENTATION?

7 Answers  


I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.

0 Answers  


Specify ideal accuracy of flow element like orifice plate, Ventury, Annubar. Ultrasonic flow meter etc.

0 Answers  


where i can get training in INTOOLS and PDMS in Delhi-NCR OR north part of India. please reply with ur ans. at arunsamkaria@ymail.com

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)