Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate orifice sizing? and tell me if pipe size bet
50mm t0 200mm then we can use pipe flange??? and above 250mm
pipe size should i use D & D/2 Flange? is it right or wrong?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Instrumentation Interview Questions

what is hot loop check and cold loop check.

3 Answers   Bapco Bahrain Petroleum Company,


what is full form of SMART

46 Answers   Infosys, ITC Infotech, Lanco, Rosemount, Solvay,


what is difference between fork type and capacitance type level switch. where it is using

0 Answers  


If the Barrier Fails during online then What will be the control valve position in field or Positioner action in the field.

3 Answers  


Differentiate between ultrasonic flowmeter and radar type flow meter

0 Answers  


what is coriolis principle for mass flowmeter?

5 Answers   ABB,


Distributed control system

1 Answers   CCIE,


what is Instrumentation?

5 Answers   RCL, TCS,


plz send me general of ongc

0 Answers   ONGC,


how to do dynolab wind speed sensor loop test, how to simulate value,i have simulate mA 4-20mA but not responding in DCS faceplate, please kindly advice me any one.

0 Answers  


why vortex flow meters and electro magnet flow meters are used in water treatment plants

1 Answers   Elite Construction,


If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , then it will reaches again 50%, this type of action occured frequntly.. so what to do for solve this problem. The possible cause is in volume booster or positioner's relay.. positioner is double acting .. and make siemens..sipart.The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?

2 Answers   Gujarat Fluorochemicals Limited (GFL), Shell,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)