What is meant by MRP Type and lot sizing?
Answers were Sorted based on User's Feedback
Answer / subramanian
It is procedure that you set in the system on how the
Material is planned
Reorder Point
Seasonal requirement
Replenishment
Vendor Managed
Forecast Based
Master production Scheduling
Lot size :
You can define your requirements (to be produced or
Procured) in terms of Weekly, Monthly, Qty based, Maximum
Replenishment
Is This Answer Correct ? | 28 Yes | 7 No |
MRP type-
Key the determines wether and how the material is
planned.you have the following options.
-manual re-order point
-automatic re-order point
-fore-cast based planning
-material requirement planning
-master production scheduling.
LOT-SIZE-
Key that determines which lot size procedure, the system
uses with in material planning to caleculate the quantity
to be procured or produced.
Is This Answer Correct ? | 19 Yes | 5 No |
MRP TYPE:
A key that controls the mrp procedure(mrp,re-order point,forecast based,time phased planing)used for planning a material.
Lot sizing:
A procedure in material requirement planning used to calculate orders and production quantities.
there are three groups of procedures exist for calculating the lot size.
1. static lot sizing
2. period lot sizing
3. optimizing lot sizing
Is This Answer Correct ? | 13 Yes | 6 No |
What is meant by a release strategy?
i am doing sap mm,i have a question, do consultants copy n save from sap std.1000 in real time too
How u will transfer LSMW data from development to production? And on which server u will test the LSMW data?
List out the important field in purchasing view?
Is material and vendor data available at all organizational levels?
How to inventory excise duty in SAP?
what is the current situation of SAP MM in market,as i have 5+yrs of domain n want to change 2 SAP, i have come 2 know thru SAPGURU that SAP is at saturation stage i.e MM SD PP & 90% of companies have implementd SAP there wnt be implemntn in future. is it true?plz let me know. THANX
In your up gradation project 4.6B version to ECC6.0 what differences observed in SAP MM explain
What are the types of special stocks available?
What are the account assignment categories in a purchase order?
What is dunning procedure? How can it be configured?
What is the class type?