How is a shelf-life item managed in SAP? What is the full cycle?
Answers were Sorted based on User's Feedback
Answer / bond,james bond
shelf -life item managed in MM01 where u can the fields as
per the business
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / saurabh patil
Shelf life data maintained in plant data view 1 in material master
there are 2 fields
1 Total Shelf Life - Lets assume is 30 days.
Then GR data is production date and
GR+30 days is expiration date
Lets assume not maintained.
Date in GR is considered expiration date
2 Minimum remaining shelf life
The minimum remaining shelf life for the system to accept GR of the material.
Lets assume this vale is 15 and the material arrives with shelf life expiring in 10 days . Then system will not accept GR.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / eldi
Using QM - Batch Management, we can assign validity period
to each batch of a product. Cannot understand what is meant
by a full cycle. The process would be PO-GR-GI (At gr,
batch number having specific characteristics such as
validity date is assigned)which gets tracked during each
movement of the product till is is exhausted. To make
things easier, we used the validity date in the name of the
batch itself so that they were easily identifiable in MMBE.
Is This Answer Correct ? | 1 Yes | 4 No |
SD with MM Integration what you have done in real time in your project
what is the transaction code used to extend the material view?
How to delete a batch?
WHAT R ALL THE LEVELS INFORECORDS R MAINTAINING ?
What are the prerequisites of creating a purchasing info record?
at what level accounting view is maintained ? the moment u enter data in accounting view what prompt request u will get?
How to give specifications for developments?
How system pick up g/l account in service po
When, in initial configuration, why would you have to setup stock transport order?
Hi, Please inform possibility of editing GR & how.
Explain the 'accounting' side of gr?
What is sap mm?