How is a shelf-life item managed in SAP? What is the full cycle?
Answer Posted / saurabh patil
Shelf life data maintained in plant data view 1 in material master
there are 2 fields
1 Total Shelf Life - Lets assume is 30 days.
Then GR data is production date and
GR+30 days is expiration date
Lets assume not maintained.
Date in GR is considered expiration date
2 Minimum remaining shelf life
The minimum remaining shelf life for the system to accept GR of the material.
Lets assume this vale is 15 and the material arrives with shelf life expiring in 10 days . Then system will not accept GR.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain the terms planned delivery and gr processing time?
What are the core functionalities of the sap system?
How will you transport release strategy from quality server to production server? Will you transport it from one server to another?
What is the difference between contract and scheduling agreement?
Which documents are used as references when we create po?
You can Ask any Technical Question Related to SAP MM Module AT Functional consultant level,Testing or end user level
What do you mean by subcontracting?
Can we change the layout of miro screen? Does it require enhancement?
What are the lot size attributes a material can posses?
What are the special stocks in sap?
What is purpose of gr based invoice verification in business? What is the business benefit of this check box?
What are the plant-specific data in the material?
How do you display a list of all reservations in the system?
How will you map subcontracting process for project stock?
Differentiate between release procedure with and without classification