What is the difference between routine and requirements?
Answers were Sorted based on User's Feedback
requirement:
i know requirement in sd point of view
1. requirements are used in different area of sd, for
example requirement in pricing procedure,it restrick the
access of the condition type.
for example the rebate condition type bo01 has the
requirment 24 it means that this condition type should
appear in the billing document.
routine means the program written for the requirement.ie
the logic written in the abap code.
Is This Answer Correct ? | 20 Yes | 2 No |
Answer / akshyay
Requirements specify how to transfer.If requirements are
met then only data transfer take place. i.e. QT to OR same
customer req-1 Diff customer req-2.
Routines specifies what data is to be transfer header data
or item data
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / subha
Requirement comes in pricing with respect to configuration
Routine comes in coustomisation with respect to
Enhancements once the configuration is done and the cleint
wants to make the change ( add or delaete some information)
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / diptee
Requirement is a condition , generally its used in sd practice, ( like:pricing requirement, output requirement , copy requirement ) like that.
2. routine is a program written for that requirement with abap code.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / riyaj
requirement has the routines which has logic written in abap
code.
* if am wrong plz correct me
Is This Answer Correct ? | 0 Yes | 6 No |
What are the fields in Pricing Pro Determinations?
Is it possible to save incomplete document?
What makes Listing & exclusion Work Differently than each other?
What is an outline agreement?
Explain End user traing in Sap sd
Can we configure third party skus to consignment process.
What is an integration point between sd and mm?
where we will maintain loading dates and transportation dayes?
Do we have 2 maintain schedule lines for all the items all the time? If not what are the exceptions? What are Text items? Do they have Schedule lines? What are Value items? What is service item? Explain each of them in detail along with one example?
What is your role in implementation project
How we do the PS to Order?
Can we rename movement types?