what is procedure to find the volume of material in M20
concrete?
Answer Posted / ajithprasa vd
M20 means 1 part cement , 1.5 part sand and 3 part aggregate
Cement 7.5 bag
Sand 0.5 M3
Aggregate o.85 M3
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
How much cement is require in one sqft area in a G+3 residential construction.
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
what is modular brick and it size
how we can find sieve #4 is 4.75mm?
Explain different types of rcc pipes.
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
Describe a time when you anticipated potential problems and developed Preventive measures
What is gravity flow?
How much quantity of rod binding work by a rod binder per day
Can we apply curing compound on ceiling (slab Bottom)
What is meant by autocad?
what is a well
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?