57. Calculate the volume of a truck loaded with stone
chips whose data are as follows–
5
Top Length - 13-9, 13-10, 13-09
Bottom Length - 13-11, 13-10.5, 13-10
Top width - 8-7.5, 8-8, 8-7
Bottom width - 8-7, 8-8, 8-7.5
Depth - 2-0, 1-11.5, 1-10, 1-11, 1
-10.5, 1-11.75, 1-11
No Answer is Posted For this Question
Be the First to Post Answer
why the brick is red in colour?
What is the maxi. percentage of steel in compression memeber of C/s area & what is minimum dia for compression member as per IS 456:2000?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
how much brick,cement,and sand required in 1cum brickwork(1:4)
if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??
what r you reqired for concrete baching plant?
what is the proportion of m20 grde concrete? also how much water is required for this proportions? As there were any formula for water-quantity?
which has high coefficient of discharge venturimeter or orificemeter
How will you determine the capacity of a reservoir with help of contur
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
WHAT IS DIFFERANCE BEWTWEEN NP2 AND NP3 OF RCC HUME PIPE?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)