what,s the clear cover of beam,slab,column,lintel and
foundation?

Answers were Sorted based on User's Feedback



what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / ravikumar patil

clear cover for slab-15mm
for beam- 25mm
for column- 40mm
for foundation- 40-60mm
for lintel- 20mm

Is This Answer Correct ?    899 Yes 65 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / jayshankar dwivedi

Clear cover depends upon exposure condition it varies
condtion to condition Generally it is For Beam 25mm,Slab
15mm, Column 40mm and Foundation 50 mm

Is This Answer Correct ?    301 Yes 30 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / maharshi

clear cover for slab-15mm
for beam- 25mm
for column- 40mm
for foundation- 50mm
for lintel- 20mm

Is This Answer Correct ?    250 Yes 23 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / mahendra

it depends upon the exposure condition and fire resistance.
but normally it is taken as follows,

slab =20mm
beam =25mm
column =40mm
footing=50mm

Is This Answer Correct ?    146 Yes 34 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / rasel cee

Clear Cover for
beam,column 1.5"
slab 3/4"
foundation 2.5"-3"

Is This Answer Correct ?    58 Yes 21 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / er. bishnu prasad mohapatra

slab-20mm
beam-25mm
column-40mm
footing -50mm(bottom)
         75mm(top and side)

Is This Answer Correct ?    46 Yes 12 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / vicky

Slab 20mm
Beam 25mm
Column 40mm
Foundation 50mm

Is This Answer Correct ?    24 Yes 2 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / awol seid

beam=25
slab=15
column=40
foundation=40-60

Is This Answer Correct ?    29 Yes 11 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / er. noman ali

Clear cover to main reinforced in
Footing - 50mm
Raft foundation top - 50mm
Raft foundation bottom/ sides - 75mm
Strap beam - 50mm
Grade slab-20mm
Column - 40mm (d>12mm)
- 25mm (d=12mm)
Beam - 25mm
Shear wall - 25mm
Slab -15mm or 20mm
Retaining wall on earth 20/25mm

Is This Answer Correct ?    11 Yes 1 No

what,s the clear cover of beam,slab,column,lintel and foundation? ..

Answer / prithvi rawat

SLAB - 25
BEAM - 30
COLUMN - 40
FOOTING - 50
RAFT - 55
RETAINING WALL EARTH SIDE - 40
INNER SIDE - 25

Is This Answer Correct ?    38 Yes 30 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.

0 Answers   MTC,


How to calculate the compressive strength of 28 days of concrete where we have 7 days compressive strength?

2 Answers   ACF,


What is allowable limit of silt in river sand for concrete

3 Answers   UIPL,


How to calculate the design of column by simple method? 

2 Answers   L&T,


what is mean by bPo in construction? pls tell me

1 Answers   Sangini, SRM, SV,






i m a btech 1st year student of civil branch. i want to do mba in future after having some work experience in civil field.is there any mba course made exclusively for civil engineers?

3 Answers  


how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl

3 Answers   Thermax,


I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shuttering, reinforcement steel, brick work, earth work?

1 Answers  


i want to make this calution for making a buliding but i dont know the formula for this and also how much cement concrete an sand use for this calculation,calculation is below(100ft lenths 75ftwidth and 100mm thikness)plz brife the calcution thanks

1 Answers   Sobha Developers,


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

0 Answers   L&T,


a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.

1 Answers  


what is P.C.C ?

13 Answers   RCC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)