Answer / ravikumar patil
clear cover for slab-15mm
for beam- 25mm
for column- 40mm
for foundation- 40-60mm
for lintel- 20mm
Is This Answer Correct ? | 899 Yes | 65 No |
Answer / jayshankar dwivedi
Clear cover depends upon exposure condition it varies
condtion to condition Generally it is For Beam 25mm,Slab
15mm, Column 40mm and Foundation 50 mm
Is This Answer Correct ? | 301 Yes | 30 No |
Answer / maharshi
clear cover for slab-15mm
for beam- 25mm
for column- 40mm
for foundation- 50mm
for lintel- 20mm
Is This Answer Correct ? | 250 Yes | 23 No |
Answer / mahendra
it depends upon the exposure condition and fire resistance.
but normally it is taken as follows,
slab =20mm
beam =25mm
column =40mm
footing=50mm
Is This Answer Correct ? | 146 Yes | 34 No |
Answer / rasel cee
Clear Cover for
beam,column 1.5"
slab 3/4"
foundation 2.5"-3"
Is This Answer Correct ? | 58 Yes | 21 No |
Answer / er. bishnu prasad mohapatra
slab-20mm
beam-25mm
column-40mm
footing -50mm(bottom)
75mm(top and side)
Is This Answer Correct ? | 46 Yes | 12 No |
Answer / er. noman ali
Clear cover to main reinforced in
Footing - 50mm
Raft foundation top - 50mm
Raft foundation bottom/ sides - 75mm
Strap beam - 50mm
Grade slab-20mm
Column - 40mm (d>12mm)
- 25mm (d=12mm)
Beam - 25mm
Shear wall - 25mm
Slab -15mm or 20mm
Retaining wall on earth 20/25mm
Is This Answer Correct ? | 11 Yes | 1 No |
Answer / prithvi rawat
SLAB - 25
BEAM - 30
COLUMN - 40
FOOTING - 50
RAFT - 55
RETAINING WALL EARTH SIDE - 40
INNER SIDE - 25
Is This Answer Correct ? | 38 Yes | 30 No |
beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center
which has high coefficient of discharge venturimeter or orificemeter
Why sea sand and desert sand are dont used for construction
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
how gradation of aggregates effect on slump of fresh concrete?
A lorry contains 3-Units of material(Sand/Metal/Gravel...) so 3-Units means how many (CFT and M3)
How to calculate the quantity for masonry(block and plaster)?
how to calculate the steel quantity for columns and beams
How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300 sft in final coat with 12 mm. Any math involved? Plz help
31 Answers Asia Engineering, GMS, LTT,
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
what if tie beams coming from x axis do not meet tie beam coming from y axis? Is it safe if they dont meet?