what is procedure to find the volume of material in M20
concrete?
Answer Posted / i.rajamohamed. p.s.y.e.college
M20 ratio is 1:1.5:3( TAKE 20mm aggregate)
(i)add ratio= 1+1.5+3= 5.5
(a) volume of aggregate = 1\7*1.57 = 0.22m3
(b) volume of sand =1.5/7*1.57= 0.33m3
(c) volume of cement =3/7*1.57 = 0.67m3*1440=964 kg.
(note: 1.57 for 1m3 box)
| Is This Answer Correct ? | 5 Yes | 16 No |
Post New Answer View All Answers
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
Specific gravity of cement?
400 ku d/c clearess ketan hota hai?
what is the composition of good brick ?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
How to calculate quantity of plum masonry in 1:3:7
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
how to calculate the chair reinforcement length in slabs, footing or anywhere??