what is procedure to find the volume of material in M20
concrete?
Answer Posted / i.rajamohamed. p.s.y.e.college
M20 ratio is 1:1.5:3( TAKE 20mm aggregate)
(i)add ratio= 1+1.5+3= 5.5
(a) volume of aggregate = 1\7*1.57 = 0.22m3
(b) volume of sand =1.5/7*1.57= 0.33m3
(c) volume of cement =3/7*1.57 = 0.67m3*1440=964 kg.
(note: 1.57 for 1m3 box)
| Is This Answer Correct ? | 5 Yes | 16 No |
Post New Answer View All Answers
What ingredients with% found in ppc cement??
How to testing voids of filled aggregate in bitumen mix design
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
IS code for grade of concrete for bamboo lintel????
How to plan a project
Define mirror?
Define What is the tallest man made structure in the world?
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
why the profile of shell of natural draught cooling tower is hyperabolic.
If specific gravity of cement is less than 3.15 what is the cause?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
how to stop beam concrete between column
How to calculate chejja reinforcement