Explain what is the difference between built area and super built up area?
No Answer is Posted For this Question
Be the First to Post Answer
Pls explain me about tension and compression in a flat slab
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
0 Answers Ajai Builders, Malhotra Associates,
How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
wha is frog?
What is cold joint, what will happen due to cold joint?
how to calculate the quantity of cement,sand and aggregate when the ratio of mixing is 1:2:3
0 Answers Ajnara Group, Assosa University,
In case of tunnels (Railway) what is the way of securing a wall beam?
indiploma civil engineering student r studied is456-1978. but in practicial we r using 2000 version i think 1978 version didn't use the student. any openion?
WHAT SHOULD BE THE THICKNESS OF CEMENT M-SAND MIXER IN BETWEEN TWO SOLID CEMENT BRICKS USED FOR A HOUSE WALL?
How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?
.5Ast