how much binding wire is required for one tone steel
Answers were Sorted based on User's Feedback
Answer / yogesh
5.4 kg of wire is required to tie an average tonne of bars
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / rajesh ghyar
I think 10 to 13 kg/MT Binding wire is required to bind the reinf. steel. Actually it depends upon the sizes of bars. It consumed less in slab binding whereas it consumes more in columns. But it can be vary in Bridge structure.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sufiyan
An steel reinforcement binding wire require 8 kg per my.
Er sufiyan ahmed
9310225128
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mohammad tariq
5-to 6 kg per ton binding wire required for foundation work
Is This Answer Correct ? | 2 Yes | 4 No |
Answer / @@@@@
wire cannot be actually said how much required for 1ton or
2ton, it actually depends on the design given to in which
the spacing varies so wire required also varies for column
footin and slab. u can just assume a small quanity of wire
to avoid wastage.
Is This Answer Correct ? | 3 Yes | 8 No |
According to me its should be 5 kg to 6 kg binding wire is required for one tone reinforcement.
Is This Answer Correct ? | 11 Yes | 17 No |
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
how many binding wire can be required for 1 metric tonne steel?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
calculate the quantity of water for 1:6 cement mortar
0 Answers Pratibha Industries,
how many lab test on bricks and aggregate write briefly please
what is the breaking strength of wall tiles
how many bags of cement are needed to make a cement mortar of 1:3
5 Answers ABC, DBL, DHFL Dewan Housing Finance Corporation, VV, WADAN,
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
what is workmanship.
where we provide hinged joint in a framee structure ?
how to creat mix m-20? and how to check shuttering & how is mark layout at open ground
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
0 Answers Ace Info, Anil Group,