how much binding wire is required for one tone steel
Answer Posted / mohammad tariq
5-to 6 kg per ton binding wire required for foundation work
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
What will be weight of 0.5mm GI sheet per sq.ft?
how i can tak Quantity of mortar in block work
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
five benefits of using standard terminology in the measurement process
whaat is blister in box girder bridge and what is its function..
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
What do you meant by gui?
specifications of fe500 steel
in the earthquqke the profile of water on dam is parabolic or not
What is meaning of tlc
what is w/c ratio in dry lean concrete for m10 mix design