BASIC DIFFRANCE BETWEEN LIMIT STATE METHOD AND WORKING
STRESS METHOD?
Answer / mizpah
Working stress method of design based on the elastic theory in which materials, concrete and steel are assumed to be stressed well below their elastic limit under the design loads. Working stressess (permissible stress) for the materials are determined by dividing the ultimate or yield stressess by suitable factor of safety values.
Limit state method of design based on limit state concept, te structure shall be designed to withstand safely all loads liable to act on it throughout its life;It shall also satisfy the serviceability requirements, such as limitations on deflection and cracking. The acceptable limit for the safety and serviceability requirements before failure occurs is called a "limit state". The aim of design is to achieve acceptable probabilities that the structure will not become unfit for the use for which is intended, that is that it will not reach a limit state...
Is This Answer Correct ? | 9 Yes | 3 No |
how to calcalate for roof beams & slab reinforcement design specified?
what is the lap length
How you will differentiate in field between grade43 and grade53 catagory cement?
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
What is RCC grade of NP 2 hume pipe, Dia and arrangement of reinforcement in it?
what is the weight of 1 meter iron road if its diameter is 20milimeter. 2.when we find the weight of 1meter iron road we help the following formula dxd162 .what is 162 plz tell me
How much for the BRC lapping in full yield and half yield < and which table to get it ?
Ratio of cement : sand for fixing slab and tiles in the floor and also quantity of cement and sand requires for laying slab and tiles separately (area 100 sq. ft)
Manpower required for de shuttering of conccrete slab
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
Where are laterally loaded piles are used in practice?
in one SQM plaster how much Cement and sand consumed in ratio 1:4