BASIC DIFFRANCE BETWEEN LIMIT STATE METHOD AND WORKING
STRESS METHOD?



BASIC DIFFRANCE BETWEEN LIMIT STATE METHOD AND WORKING STRESS METHOD?..

Answer / mizpah

Working stress method of design based on the elastic theory in which materials, concrete and steel are assumed to be stressed well below their elastic limit under the design loads. Working stressess (permissible stress) for the materials are determined by dividing the ultimate or yield stressess by suitable factor of safety values.

Limit state method of design based on limit state concept, te structure shall be designed to withstand safely all loads liable to act on it throughout its life;It shall also satisfy the serviceability requirements, such as limitations on deflection and cracking. The acceptable limit for the safety and serviceability requirements before failure occurs is called a "limit state". The aim of design is to achieve acceptable probabilities that the structure will not become unfit for the use for which is intended, that is that it will not reach a limit state...

Is This Answer Correct ?    9 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

how to calcalate for roof beams & slab reinforcement design specified?

1 Answers  


what is the lap length

2 Answers   Access Design,


How you will differentiate in field between grade43 and grade53 catagory cement?

14 Answers   Gammon, NBN,


how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???

3 Answers  


What is RCC grade of NP 2 hume pipe, Dia and arrangement of reinforcement in it?

1 Answers   NTPC, WDC,






what is the weight of 1 meter iron road if its diameter is 20milimeter. 2.when we find the weight of 1meter iron road we help the following formula dxd162 .what is 162 plz tell me

4 Answers   L&T,


How much for the BRC lapping in full yield and half yield < and which table to get it ?

0 Answers   Engtex,


Ratio of cement : sand for fixing slab and tiles in the floor and also quantity of cement and sand requires for laying slab and tiles separately (area 100 sq. ft)

1 Answers   DLF,


Manpower required for de shuttering of conccrete slab

1 Answers   Ameco,


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

0 Answers   UPSC,


Where are laterally loaded piles are used in practice?

2 Answers   NBCC, Simplex,


in one SQM plaster how much Cement and sand consumed in ratio 1:4

0 Answers   ULM,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)