Steel requirement in kg of 6" thk slab Total qty 32.64 m3
Beam / column qty 35.39 m3
No Answer is Posted For this Question
Be the First to Post Answer
what is spt
What is difference between engineering stress and true stress?
How to increase a bearing capacity of soil?
what is meant by pqc
2 Answers APCO, Sunil Hitech Engineers,
How to do lineout of building
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
sir, i used 43grade opc cement to my wall plastering,i have cured 20 days ,recently , white dots and white powder shades are appearing on walls, is it any defect by curing excess days? have any disadvantages by it ? please answer
Why we use pcc in foundation?
why reinforcement is not provided at centre for beams r column
what does the grad of cement shows (denotes)?
what is correct temperature for pouring concrete?
Why we test compressive strength after 28 days..?
3 Answers NM Caramoan Builders,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)