actually dia of the bar reduce asper drawing spacing also
decrease that time so how to calculate the spacing of with
respect to changed bar dia?
what are the mixing of M10,M15,M20,M25,M30grades?
If we use oil,inner on the column box, it'll make rust on the column steel?
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
what is the real de-shuttering time for rcc column,slaband wall
In footing (mat) if two different dia of rods are to be used which rod should be placed at top and bottom ( eg. 10mm & 16mm dia rods)
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
what is the use of water bar in water tank and is this an extra item in estimate?
What is the meaning of Fe415 ?
6 Answers Arul Constructions, L&T, SSM,
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
what is the percentage of binding wire required for 1 mt of steel binding in gerally
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
how can change 12mmdia@150c/c bar spacing to 16mmdia
12 Answers Amanah Tech, Envoy Group, Globus Constructions,