what is the real de-shuttering time for rcc column,slaband
wall
Answers were Sorted based on User's Feedback
Answer / shishir bhansali
rcc column 12 hours
rcc slab depending upon the span. from 5 days to 14 days
rcc wall 12 hours
| Is This Answer Correct ? | 29 Yes | 3 No |
Answer / ravi kant sharma
Minimum 16 to 18hr for column for any grade of r.c.c.
| Is This Answer Correct ? | 8 Yes | 0 No |
Answer / royalcivil
the de-shuttering time for the slab is 21 days must.
for the column it should be minimum of 1 week
| Is This Answer Correct ? | 10 Yes | 26 No |
difference b/w stress and strength
what is levelling staff least count
among fine,coarse sand which is used for plaster, brickwork and RCC & why?
in 1:4,1:6 and 1:8 cement mortar mix how much water required? and find water cement ratio?
what grade of concrete to be used for lintel when reinforced with bamboo in place of steel?????????
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
How to Calculate the amount of Cement mortor required only for 12 or 10 mm bonding? I mean to know only the amount of mortar for bonding not for plastering. Help me to find this.
WHAT IS DIFFERANCE BEWTWEEN NP2 AND NP3 OF RCC HUME PIPE?
If we use oil,inner on the column box, it'll make rust on the column steel?
What are the basic use of runners and standards of pipelines?
lap lenth
ratio of rcc 1:1.5:3 grade of concrete ,7days& 14&28 days after curing how much strength of compressive strength in rcc slab
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)