i feel sq. pipe is better than round pipe pls give comment
for this.
advance thanks for reply
Answers were Sorted based on User's Feedback
Answer / vijay kumar
pressure in round pipe is eqale in all direction but in sq
pipe pressure in all direction is not same that will make
crack on pipe
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / jazz
pipes are round since pressure is exerted equally in all
directions, all pressure points are equal. if you have a
square pipe, pressure is exerted more on the 90 deg bend for
a square pipe, so since Pressure=Force/Area , you have a
very small area in the bend Force is greatest where you have
a very small cross-sectional area.That point (bend) becomes
a weak point, and becomes a possible leak point.
| Is This Answer Correct ? | 1 Yes | 0 No |
i think in both we can get the center point, because in square all sides have the equal length, like wise in circle they have the equal diameter ,so in both we can get the center point..
* round pipe is always used because at the bending the flow is same,but in square at the bending we can't expect the perfect shape there may be some leak , tat's is the main reason i think so. we can't expect the 100% flow into the pipe, error may be around +or- 10%
| Is This Answer Correct ? | 1 Yes | 2 No |
can any one give me the cost price of yokogawa & rosemount transmitters
Give me best instrumentation Books name..Ple...
how to tune siemens sipart electro pneumatic positioner..plz tel me..
what is o2 analyzer and how it measured ,what is the role of this analyzer in cfbc boiler...
please explain clearly in PID controller if We increase P only what will be action of the contrlere.
need instrumentation job completed 1 year trainee ship in mnc pesticide company. now in search of job
What is the cascade control
pressure switch range 0 to 2bar.i have to install from ground level to 5 meters height.what is the formula the to increse the range ? and every 1 meter how much pressure should be add ?
Hi at present i m wrking with tire industry as a manager having gud ctc. Nw I am selected for 1 of the best chemical industry but my ctc is lower than current n also i hv 2 compromize vit post as post is also lower. I hv 6 yrs of exp in various type of industry. Should i join chemical industry as there ar lot of gud instrument than tire? Financialy i can manage 4 more 2 yrs. Bt during wrking vit tire industry i found there is very less instrument n feel that opportunity is less. Pl ans quickly. I have less time to decide.
How can we use feedback signal frm rtd for monitoring and in dcs for controlling ,then which type of rtd is sutaible 2 , 3,4wire and why ?
what is stroke check for field instument transmetter's & AOV's
thru which signal does µP communicate with memory
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)