A single line diagram(SLD) and a purchase order of a
11/66kV switchyard of a power plant was given. In the SLD,
only one lightning arrestor(LA) was shown, but the purchase
order had need of 3 LAs. Is this correct, if yes, why?

Answers were Sorted based on User's Feedback



A single line diagram(SLD) and a purchase order of a 11/66kV switchyard of a power plant was given..

Answer / sakthivel

IT IS CORRECT WE REQUIRED 3 LA IN 3 PHASE

Is This Answer Correct ?    16 Yes 2 No

A single line diagram(SLD) and a purchase order of a 11/66kV switchyard of a power plant was given..

Answer / k.prakashchandra

We have 3 phase Tr ,breaker,G.O.S. but no 3 phase L.A.

Is This Answer Correct ?    2 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT

0 Answers  


why v use only sodium bulb or orange color lights on streets, y nt CLF OR TUBE LIGHTS

3 Answers  


avr is an automayic voltage regulator ... it regulates voltage before it synchronise with grid after synchronisation it regulates power factor why....

7 Answers  


how the speed of the gets motor regulated. does it draw the same current on the all speed level.

0 Answers   Danko,


how can i get the entrance exam papers

0 Answers  






what is name of transformer oil ?

58 Answers   L&T, MPSEB, OPTCL, Practical Viva Questions, Servo, TATA, XLPE, ZGL,


Why the pointer of earthing of 3 pin top is made thick and long compared to the phase and neutral pin ?

3 Answers   Sanima Hydro Power,


What is P.F? Formula for calculating PF in HT side?

1 Answers  


how to calculate energy of 3-phase motor?

0 Answers   Suzlon,


List examples of voltage source?

0 Answers  


Suppose an electric motor with a controller is not working. What is the sequence of testing you will do in your troubleshooting?

2 Answers   Emerson,


I am doing apprenticeship training at HT switch yard in NLC. How can i get electrical c license. ??? What r the rules for getting it as an apprentice? ??

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)