A single line diagram(SLD) and a purchase order of a
11/66kV switchyard of a power plant was given. In the SLD,
only one lightning arrestor(LA) was shown, but the purchase
order had need of 3 LAs. Is this correct, if yes, why?
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
We have 3 phase Tr ,breaker,G.O.S. but no 3 phase L.A.
Is This Answer Correct ? | 2 Yes | 2 No |
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
why v use only sodium bulb or orange color lights on streets, y nt CLF OR TUBE LIGHTS
avr is an automayic voltage regulator ... it regulates voltage before it synchronise with grid after synchronisation it regulates power factor why....
how the speed of the gets motor regulated. does it draw the same current on the all speed level.
how can i get the entrance exam papers
what is name of transformer oil ?
58 Answers L&T, MPSEB, OPTCL, Practical Viva Questions, Servo, TATA, XLPE, ZGL,
Why the pointer of earthing of 3 pin top is made thick and long compared to the phase and neutral pin ?
What is P.F? Formula for calculating PF in HT side?
how to calculate energy of 3-phase motor?
List examples of voltage source?
Suppose an electric motor with a controller is not working. What is the sequence of testing you will do in your troubleshooting?
I am doing apprenticeship training at HT switch yard in NLC. How can i get electrical c license. ??? What r the rules for getting it as an apprentice? ??