what should be the quantity of water in m20 cocnrete /per
bag cement-- whats the formula
Answers were Sorted based on User's Feedback
Answer / abdul samad
The W/C Ratio generally varies from 0.3 to 0.6, But preferable is 0.5 if your mix is not designed one. otherwise it is suggested by the designer.
Is This Answer Correct ? | 1 Yes | 0 No |
the watter is mix in cement weaght of 40%
Is This Answer Correct ? | 1 Yes | 1 No |
the watter is mix in cement weaght of 30%
Is This Answer Correct ? | 1 Yes | 5 No |
How many number of chairs required per Smt.
RCC MEANS
what is slope provided to floor?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
how many bags 0f opc cement in 1 m³
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
Pl let me know approx. Rcc construction cost per sq.Foot for Building a house with2800 sqfeet carpet area in pune city
what is diversion?
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
How can we convert weight batch to volume batch for m30 mix
what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.
2 Answers TATA, Vastu Kirti Enterprises,
Difference b/w tor steel or tmt bar