If the take column and beam plaster the are taken plaster sqm or sqf
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / mukhram singh
the take column and beam plaster the are taken plaster sq m or sq f.
| Is This Answer Correct ? | 2 Yes | 0 No |
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
width rangs in NH,SH in one-way lane &two-way lane why we are provid caber is there any reson for that
how many cement used in single story residential building per sqft
0 Answers Matrix PMC Consortium,
As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came
How is rate analysis prepared for M 25 grade of concrete?
The mixture of different ingredients of cement is burnt at?
What was your synopsis for thesis topic?
What are the applications of the modulus of elasticity?
What will be the maximum length of RCC Lintels?
What is packing Factor ?
Is there any software to prepare the Estimate of building.Plz tell me.......
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)