Please design 12.5m long dubbly beam
No Answer is Posted For this Question
Be the First to Post Answer
What is the stripping time of shuttering for PPC concrete
what is mean by hysd bar?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
deshuttering time for RCC for DPC over the foundation.
clear cover for concrete structures as per BS
Can i have pumpable mix design for M10 concrete without fly ash with OPC 43G cement?
What is thumb rule in quantity and cost estimation of a residential building?
0 Answers Ascent Constructions,
What are the types of test used to determine soil bearing capacity
Rectangular room is more effective than a square room because ––
Why use of fly ash in cement
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Differentiate first angle & third angle projection?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)