what should be the quantity of water in m20 cocnrete /per
bag cement-- whats the formula
Answer Posted / jitender mishra
the watter is mix in cement weaght of 30%
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
150mm bricks size how many use 4.14 m3
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
what is mc arther pile?
Can we apply curing compound on ceiling (slab Bottom)
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
How much does the leaning tower of pisa lean?
How much cum. Brick work can do by 1 madon
Define block?
what is kribs is supporting?
yasser arfatcompleted his degree in civil from which university
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm