Why should you show Client/Engineer activities clearly on the
project plan?
No Answer is Posted For this Question
Be the First to Post Answer
what is pqc
i have a bar of 36 dia in column, what is the lap length?
Consumption of Binding wire for fixing of cover block in vertical surface
what is the significance of soundness test in Cement? and how is it done??
1 Answers Biltech Building Elements, Student,
how to calculate quantities of sand , cement & aggregate in 1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of 10cm brick wall, paint quantity for 1m2 snowcem and lime painting?
3 Answers DCPL, EverSun, Pace Power Systems, Sobha Developers,
define formwork
how many pcs of steel bundule in all dia 8,10,12,16,25,32,40 please how many pcs in bundle of packing??
How to calculate carrying capacity of the existing water supply trunkmain
why spacer in reinforcement?
what is a louer? and for which purpose it will be used.
What is construction mitigation management?
what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)